Engineering & Construction 

Project: Procurement and construction of small and medium sized projects for KNPC PD.

Client: KNPC.

Scope of Work: Engineering, procurement, construction involving Civil and Structural, Mechanical, E&I, Specialized Services, NDT.

Completion: July 2014







Project : Construction of 600 MTPD CO2  Liquefaction plant.

Client : M/s Green Carbon Co. WLL

Contractor : M/s Electrical Contracting Co. WLL

Scope of work :

Installation of OSBL piping including excavation, structural, fabrication and laying SS pipes.

Completion Date : August - 2014



Project :– Inert Gas Piping and Tank Piping Works.


Client : Hanwha Engineering & Construction.

Scope of Work :

Fabrication and Installation of Inert Gas Piping.Fabrication and Installation of Tank aboveground Piping.Scaffolding for the building works. Painting Works. Eye washer installation. Demolition works


Completion Date : August 2014

Project :– FCC Blower Motor with a higher Capacity Motor at MAA Refinery.


Client: KNPC.

Scope of work:

Replacement of the existing Fluid Catalytic Cracking Blower Motor, with a higher capacity Motor-Generator, in Unit no. 86 at Mina Al Ahmadi Refinery. This includes Detailed Engineering, Procurement, Installation and commissioning of a 13,500 HP, 11 KV FCC Motor Generator in place of the existing Motor.

Completion Date : April 2015.

Project : Manpower & Equipment Supply at Equate.

Client : Technip
Scope of Work :

Furnace Modification work of EU1 & EU 2 at Equate
Completion Date : December  2014.

Project: Replacement of Existing ammonia booster pipeline at PIC-SHUAIBA


Client: PIC

Scope of Work: Fabrication , Erection and replacement of existing pipe lines

Completion: November  2014

Project: Replacement of Obsolete Instruments in Ammonia -3 Flare at PIC-SHUAIBA.



Client: PIC

Scope of Work: Replacement of Obsolete Instruments

Completion: January 2015

 

 

 

 

Operation & Maintenance

Project:    Electrical Maintenance at Az-zour South Power Station.

Client:  Ministry of Electricity & Water

Scope of Work:

Routine /Preventive / Shutdown  Maintenance of Mechanical Equipment in all the 8  units of  Boilers , Turbines,  24  Distillation Units and other  Sea Water Intake Facilities.
Providing Services of Specialists during execution of maintenance works &  Arrangement of Training for Client Officials

Annual Maintenance works consisting of Electrical Equipment, Motors, Generators, Pumps, Switch Gears and its Auxiliaries.cabling etc.

Completion Date:   July 2017

Project:  Annual Maintenance of Instrumentation & Control System at Shuaiba Power Station

Client:  Ministry of Electricity & Water

Scope of Work:

Routine /Preventive / Shutdown  Maintenance  in field of Instruments & Control System for  Boilers , Turbines,  Distillation Units , DM Plant and other  auxiliaries. Supply of Manpower of Different categories.

Providing Services of Specialists during execution of maintenance works.  Arrangement of Training for Client Officials.

Completion Date : July 2017

Project : Maintenance Resident Contract.

Client : EQUATE

Scope of work:

Small and medium sized machenical projects including piping, equipment erection, modification, blasting and paintings, structurals etc.

Completion Date : June 2017


Project : KOC Workshop Support Services.

Client : KOC

Scope of work:

Supply of qualified and experienced professional, tool and tackles, Equipment and Vehicles.

Completion Date : October 2014


Project : 5 years contact of Hydroblasting Services

Client : Equate

Scope of work:

Hyrobalsting services

Completion Date : November 2015


Project : Mechanical seal upgrade project work and related services .

Client : Eagle Burggmann

Completion Date : November 2014


Project : Replacement of FCC Blower Motor with a higher Capacity Motor at MAA Refinery .


Client : Eagle Burggmann

Completion Date : November 2014

 Project : Resident Contrac for Mechanical Works for five years .


Client : EQUATE


Scope of Work :

Inside EQUATE Plant, for any expansion or new scope of mechanical erection shall be executed. And mechanical modification and routine mechanical maintenance of EQUATE plant area.

Completion Date :July 2018

Annual Maintenance works of Electrical Equipment at Doha East Power Station

Client : MEW

Scope: Preventive, Routine and Shutdown maintenance of Electrical Equipment
(Motors & Accessories) at Doha East Power Station -5 Yrs

Completion : March 2018

Maintenance of 11/0.433 KV Ring-Main substations at Ahmadi Governorate

Client : MEW

Scope: Preventive, Routine  maintenance of 11/0.433 KV Ring-Main substations at Ahmadi Governorate:

Completion : February 2017

 




Quality control & assurance

Project Name: Quality Control Services for KNPC.

Client : KNPC -MAA

Scope of Work :

Supply of QA/QC and Specialized NDT Manpower, Special NDT Services, NDT Equipment / Vehicles. Special NDT Services includes Eddy current testing, Fitness for services study, Remains life assessment study(RLA), Laser optic tube inspection, Acoustic emission testing, Magnetic flux leakage testing, tube testing, Long range guided wave ultrasonic testing, CHIME, radiographic examination, Automated phased array/ TOFD/ T-Scan/ Back scattering ultrasonic examination, LIXI inspection, Intelligent pigging inspection . 


Completion: September 2019


                                                                                                                                                                                                                                                          

Specialized Services

Project Name : Refractory and Fire proofing works at KNPC - Refineries.

Client: KNPC.

Scope of Work: Refractory and Fire Proofing Works including supply of materials.

Completion: March 2018

Project Name :Insulation works at KNPC - Shuaiba Refinery.

Client: CCC

Scope of Work: unit rate long term contract for Insulation works

Completion:  March 2016


Project Name : Scaffolding Services at Equate.

Client : M/s. Equate Petrochemical Company.

Scope of Work : Supply, erection & dismantling of Scaffolding in various units at Equate in accordance with Technical Scope of work.

Completion : December 2017


Project Name :Service Contract for Insulation works at Three KNPC Refineries.

Client : KNPC

Scope of Work : Supply & application of Insulation at various units in KNPC Refineries in accordance with Technical Scope of work.

Completion :Febraury 2019

Project: Painting, Scaffolding & Fireproofing works at North Kuwait (KOC).

Client: M/s. ABB S.p.A
.
Scope of Work: Blasting, Painting, Scaffolding & Fireproofing works.

Completion:  December   2014

 

 

 




Heavy Engineering

Project Name : PIPE SPOOL FABRICATION – NEW GC-16

Client :LARSEN & TOUBRO

Scope of Work : Fabrication, Inspection & Testing of Pipe Spools for New GC-16 Project, KOC

Completion : Mar 2014



Project Name : Retubing for Heat Exchangers at Mina Abdullah Refinery


Client :KNPC

Scope of Work : Transportation of old Heat Exchangers from KNPC MAA Refinery, Removing the old tubes, Re-Tubing, Testing and Dispatching to KNPC MAA Refinery

Completion : July 2014


Project Name: Fabrication of Heat Exchangers & Pressure Vessels 


Client: KNPC

Completion: May 2015



 