Drop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down Menu
Drop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down MenuDrop Down Menu


Engineering & Construction 

Project: Procurement and construction of small and medium sized projects for KNPC PD.

Client: KNPC.

Scope of Work: Engineering, procurement, construction involving Civil and Structural, Mechanical, E&I, Specialized Services, NDT.

Completion: Mar 2014







Project : Construction of 600 MTPD CO2  Liquefaction plant.

Client : M/s Green Carbon Co. WLL

Contractor : M/s Electrical Contracting Co. WLL

Scope of work :

Installation of OSBL piping including excavation, structural, fabrication and laying SS pipes.

Completion Date : Aug - 2014



Project : GRE/GRVE Piping & Wrapping Works.


Client : GS Engg & Const Co.

Scope of Work :

Fabrication, Inspection & Testing of Pipe Spools for New GC-16 Project, KOC

Completion Date : April 2014.


Project :– Inert Gas Piping and Tank Piping Works.


Client : Hanwha Enginering & Construction.

Scope of Work :

Fabrication and Installation of Inert Gas Piping.Fabrication and Installation of Tank aboveground Piping.Scaffolding for the building works. Painting Works. Eye washer installation. Demolition works


Completion Date : April - 2014

Project :– FCC Blower Motor with a higher Capacity Motor at MAA Refinery.


Client: KNPC.

Scope of work:

Replacement of the existing Fluid Catalytic Cracking Blower Motor, with a higher capacity Motor-Generator, in Unit no. 86 at Mina Al Ahmadi Refinery. This includes Detailed Engineering, Procurement, Installation and commissioning of a 13,500 HP, 11 KV FCC Motor Generator in place of the existing Motor.

Completion Date : April 2015.

 

 

 

Operation & Maintenance

Project:   Operation and Maintenance works for PowerGeneration and Water Distillation plants and other facilities.


Client: Ministry of Electricity & Water

Scope of Work: Supply of Qualified professionals and technicians for Operation and maintenance works for power generation and Water distillation plants and other facilities in Ministry of Electricity & Water. (Water projects)

Completion: Jan 2014

Project:    Electrical Maintenance at Az-zour South Power Station.(2012-2017)

Client:  Ministry of Electricity & Water

Scope of Work:

Routine /Preventive / Shutdown  Maintenance of Mechanical Equipment in all the 8  units of  Boilers , Turbines,  24  Distillation Units and other  Sea Water Intake Facilities.
Providing Services of Specialists during execution of maintenance works &  Arrangement of Training for Client Officials

Annual Maintenance works consisting of Electrical Equipment, Motors, Generators, Pumps, Switch Gears and its Auxiliaries.cabling etc.

Completion Date:   July 2017

Project:  Annual Maintenance of Instrumentation & Control System at Shuaiba Power Station (2012-2017)

Client:  Ministry of Electricity & Water

Scope of Work:

Routine /Preventive / Shutdown  Maintenance  in field of Instruments & Control System for  Boilers , Turbines,  Distillation Units , DM Plant and other  auxiliaries. Supply of Manpower of Different categories.

Providing Services of Specialists during execution of maintenance works.  Arrangement of Training for Client Officials.

Completion Date : July 2017

Project : Maintenance Resident Contract.

Client : EQUATE

Scope of work:

Small and medium sized machenical projects including piping, equipment erection, modification, blasting and paintings, structurals etc.

Completion Date : June 2017


Project : KOC Workshop Support Services.

Client : KOC

Scope of work:

Supply of qualified and experienced professional, tool and tackles, Equipment and Vehicles.

Completion Date : March 2014


Project : 5 years contact of Hydroblasting Services

Client : Equate

Scope of work:

Hyrobalsting services

Completion Date : November 2015


Project : Mechanical seal upgrade project work and related services .

Client : Eagle Burggmann

Completion Date : November 2014


Project : Replacement of FCC Blower Motor with a higher Capacity Motor at MAA Refinery .


Client : Eagle Burggmann

Completion Date : November 2014

 Project : Resident Contrac for Mechanical Works for five years .


Client : EQUATE


Scope of Work :

Inside EQUATE Plant, for any expansion or new scope of mechanical erection shall be executed. And mechanical modification and routine mechanical maintenance of EQUATE plant area.

Completion Date :July 2018

 




Quality control & assurance

Project Name: Quality Control Services for KNPC.

Client : KNPC -MAA

Scope of Work :

Supply of QA/QC and Specialized NDT Manpower, Special NDT Services, NDT Equipment / Vehicles. Special NDT Services includes Eddy current testing, Fitness for services study, Remains life assessment study(RLA), Laser optic tube inspection, Acoustic emission testing, Magnetic flux leakage testing, tube testing, Long range guided wave ultrasonic testing, CHIME, radiographic examination, Automated phased array/ TOFD/ T-Scan/ Back scattering ultrasonic examination. 

Completion: 2014


                                                                                                                                                                                                                                                           More ->

Specialized Services


Project: Service contract for Insulation Works in Three Refineries.

Client: KNPC.
Scope of Work: Insulation, Scaffolding & Painting Works.

Completion:  Feb 2014

Project Name: Insulation Refractory & Fire Proofing Services.

Client: EQUATE

Scope of Work: Insulation & Fire Proofing Works.

Completion Date: Feb 2014

Project Name : Refractory and Fire proofing works at KNPC -Mina Abdullah Refinery.

Client: KNPC.

Scope of Work: Refractory and Fire Proofing Works including supply of materials.

Completion: Dec 2017

Project Name :Insulation works at KNPC - Shuaiba Refinery.

Client: CCC

Scope of Work: unit rate long term contract for Insulation works

Completion:  2016


Project Name : Scaffolding Services at Equate.

Client : M/s. Equate Petrochemical Company.

Scope of Work : Supply, erection & dismantling of Scaffolding in various units at Equate in accordance with Technical Scope of work.

Completion : Oct 2017


Project Name :Service Contract for Insulation works at Three KNPC Refineries.

Client : KNPC

Scope of Work : Supply & application of Insulation at various units in KNPC Refineries in accordance with Technical Scope of work.

Completion : Oct 2019

Project Name : Erection of scaffolding for Tanks at KNPC - Mina Abdullaj Refinery.

Client : M/s. DAEAH Engineering & Construction Co., Kuwait.


Scope of Work : Supply all necessary manpower including supervision & materials for the Erection & Dismantling of Scaffolding for Tanks (External/ Unconfined)                              at KNPC – Mina Abdullah Refinery as per KNPC Standard Specifications


Completion : Mar 2015




Heavy Engineering

Project Name : PIPE SPOOL FABRICATION – NEW GC-16

Client :LARSEN & TOUBRO

Scope of Work : Fabrication, Inspection & Testing of Pipe Spools for New GC-16 Project, KOC

Completion : Mar 2014



Project Name : Fabrication of filter vessel/skid package

Client :PECO FACET 

Completion :Feb 2014



Project Name : Retubing for Heat Exchangers at Mina Abdullah Refinery


Client :KNPC

Scope of Work : Transportation of old Heat Exchangers from KNPC MAA Refinery, Removing the old tubes, Re-Tubing, Testing and Dispatching to KNPC MAA Refinery

Completion : May 2014



 

















asme
Home Services Projects Resources Contact Term